Draft v0 for discussion, posted 8 November 2026
Principles of the Capacity Planning Practice
A one-page draft, for argument and amendment. Every line comes from the practice’s own pages, listed at the end. Nothing here is new doctrine.
This is a draft. It isn’t adopted, and nobody can sign it yet. Signing opens after the open period, once an editor has called rough consensus. Argue it in The Commons.
The draft
We plan the capacity behind digital services, brokering between those who fund it, build it and use it, and we have come to value these things.
- Agreed numbers over measured numbers alone.
- Delivered capacity over approved capacity.
- Rules agreed in advance over negotiation in the moment.
- Legitimacy over precision.
Measurement, approval, negotiation and precision all still matter. When they conflict with agreement, delivery, rules set in advance or legitimacy, those come first.
Principles
- A coefficient is also a price, so it needs an owner, a version and a date, and is restated when hardware or the meter changes.
- Approval is not allocation: until supply answers with a dated commit or a named gap, an approval stays uncommitted.
- Commit each supply layer only when its lead time forces it, plan on the cautious lead time, and hold earlier claims as options.
- Every number has a named owner; when a plan misses, split the miss by term and send each piece to whoever moved it.
- When supply cannot meet an ask, name the gap with a date and an owner, and give every refusal a path forward.
- Agree shortage rules, landing rules and the re-cut order before they are needed; agreed afterward, they are only negotiations.
- Demand with no history enters as a signed declaration that firms up in stages, and each stage licenses only its own supply action.
- Size every buffer as a priced decision: the cost of running short against the cost of holding spare.
- Planning does not pad its own numbers. It scores supply’s promises the way it scores demand’s forecasts.
- Anyone who pays for a coefficient can challenge it through an open channel, and can sometimes win.
- Scale the discipline to the risk. Where running short costs less than the process, simpler choices are fair.
- Mark every claim as published, argued or unmeasured; the unmeasured parts are where the next work belongs.
On signing
Sign on your honor, as yourself.
How it will be decided
Changes follow How it grows. Principles changes stay open at least 30 days, or 60 while there is only one editor.
Every objection gets an answer. Then an editor calls rough consensus and writes a closing note. The founder proposed this draft, so another editor makes the call if one is confirmed by then. If not, the founder calls it and says so.
This page is separate from the guide’s own principles, which are testable claims. The framing question asks which form should win.
Three questions for the open period
These are the principles most likely to be argued. Each is a question, not a settled line.
Principle 3: commit only what the lead time forces
Senior planners in power-bound and accelerator settings buy slow layers ahead of any declaration, as a strategic bet. They may read this principle as a brake.
The working note on buildings at AI density says the shell is losing its fungibility. Once that happens, an early commitment is a deliberate choice of shape, not a neutral option.
The canon also labels the commit-point method untested.
The question. Should it read “commit what the lead time forces, and price any earlier commitment as a strategic bet”?
From: guide: note-buildings-at-ai-density, guide: settings, guide: limits.
Principles 1 and 10: a coefficient is an agreement, and anyone can challenge it
This is the seed paper’s first claim, so it is the most exposed.
People who own platforms see a coefficient as a measurement, not something consumers can negotiate. To them, a consumer who can challenge it and win looks like a bill set by lobbying.
The canon answers with legitimacy over precision, a published version and a forum that rules. That answer is argued from practice, not measured.
The question. Is the answer strong enough to put in the principles? If not, what would make it so?
From: guide: concept-the-coefficient, seed: 05-coefficients-are-agreements, seed: 10-people.
Principle 9: planning doesn’t pad, and scores supply like demand
Many experienced planners pad quietly, because it has protected them before. Supply organizations may also object to being scored on promised against actual, as demand is.
The canon says unpadded numbers are where a planner’s standing to say no comes from.
The question. Where exactly is the line between a named, priced buffer and padding?
From: guide: people, guide: concept-buffers-and-reserves, guide: concept-supply-layers-and-lead-times.
A framing question to settle first
The guide states its principles as testable claims, “not virtues”. A page of value lines cuts against that.
The question. Should the value lines stay, or should each principle keep its evidence label instead?