The Capacity
Planning Practice

Start here

Pick the door that matches your work

Each door is a short route through the body of knowledge, timed at 220 words a minute. Each one ends with three open problems and one first contribution.

Keep the glossary open beside you. The full learning path is on the body of knowledge.

35 minutes

New to the role

Up to two years in. You may arrive from hardware, site reliability, finance, supply chain or program management.

Open this door · 8 readings, and why each one matters

Three open problems

  • Try the Appendix A worksheet on an invented case. Say where it got stuck.

    On the agenda · good first

  • Q13. When a team’s own software creates the demand, is a cap a better declaration than a forecast?

    On the agenda · Discussion #14 · good first

  • No published competency map for capacity planners exists. What should a planner at each level be able to do? What confused you early on?

    On the agenda · good first

One first contribution

Name one word that confused you, and where you read it. Where it goes. Post it in The Commons.

51 minutes

Practicing planners

You run intakes, supply reviews and the ledger.

  1. 1. One page: The whole argument on one screen. 2 min
  2. 2. Principles: The rules the rest of the guide leans on. 4 min
  3. 3. The map: Read “The same launch, with the method” closely. 6 min
  4. 4. Quarterly: The intake and the supply review. 7 min
  5. 5. Monthly: Where stocked machines and turn-up commit. 6 min
  6. 6. Buffers and reserves: One line called headroom hides several buffers. 4 min
  7. 7. The worksheet: Work one launch through the method. 17 min
  8. 8. Open questions: Where the seed paper runs out. 5 min

Where it clicks. On the map, the stored-data question moves from −3 to −12 months. The method doesn’t make the forecast more accurate. It moves the hard question to the date it was needed. The map

Three open problems

  • Q2. How well do declarations land, by stage? The paper’s illustrative rule of 60% for intents and within 10% for configured asks is “a guess dressed as a number”.

    On the agenda · Discussion #3

  • Q11. The paper argues the supply review is the step most often missing before the executive decision. Is there public evidence either way? What should a supply review bring?

    On the agenda · Discussion #12 · good first

  • Q8. How often is a slipped launch’s reserve re-pegged to another tenant and reused? Its thread also holds the incentive layer: the forces that keep a slip hidden.

    On the agenda · Discussion #9

One first contribution

Say how declarations usually land against what was asked, in general terms or from public sources. Bands are fine; no company figures. Where it goes. Post it in The Commons.

1 hour 43 minutes

Senior planners

You design the portfolio, the envelope and the process across organizations.

  1. 1. Executive summary: The seed paper’s argument, end to end. 5 min
  2. 2. Operating mechanisms: Thirteen mechanisms and nine decision rights. 5 min
  3. 3. Annual: The envelope, and the slow layers it commits. 8 min
  4. 4. Post-launch: Where misses are split by owner and declarations are scored. 8 min
  5. 5. People: Seams, refusal and overrides. 7 min
  6. 6. Limits: What is argued, what is measured, and where the ideas break. 5 min
  7. 7. Case 3, the newcomer route: The case page, the problem in brief, one lens, P4 and the plan’s first 30 days. 60 min
  8. 8. Where the theory runs out: Two gaps with no ready answer. 5 min

Short of time? Swap step 7 for Case 2 in practice, about 13 minutes.

Where it clicks. The discipline is mostly argued, not measured. Six of thirteen mechanisms have no test that can fail, and none of the seven tests has been run. Your experience is the missing evidence. Limits

Three open problems

  • Q7. The method buys each supply layer to its own percentile. Can a simulation or a closed form do better, or show the rule is good enough?

    On the agenda · Discussion #8

  • Q14. The strongest known challenge to the seed paper’s central claim: where a market price exists, does the agreement still hold? Argue it, either way.

    On the agenda · Discussion #15

  • Q12. Some steps have no reference class, such as a first accelerator cluster. Beyond bounding, phasing and buying options, what has worked?

    On the agenda · Discussion #13

One first contribution

Propose a test that can fail for one of the six mechanisms that have none. Where it goes. Post it in The Commons.

22 minutes

Program managers

Many accelerator fleets are planned by program managers. You hold the schedule, the forum and the trade-offs.

  1. 1. AI and accelerator fleets: Power binds, topology is a shape, and a busy chip isn’t a productive one. 5 min
  2. 2. Approval and allocation: An approved ask still has to become machines of the right shape, place and time. 4 min
  3. 3. Three prices: Who pays, should we build, and who gets scarce capacity now. 4 min
  4. 4. Buildings at AI density: What planning loses when halls stop being interchangeable. 9 min

Where it clicks. Approval is not allocation. A fleet can hold enough chips and still be unable to place one training run, because topology is a shape. AI and accelerator fleets

Three open problems

  • Q3. When accelerators are short, who decides between internal teams and external customers? Operators publish splits and priority orders, but not the forum, the rule or the appeal. Know of a public account? Add it as a source.

    On the agenda · Discussion #4

  • Q13. When a team’s own software creates the demand, is a cap a better declaration than a forecast?

    On the agenda · Discussion #14 · good first

  • Who owns the mix forecast: the planner, the real-estate organization or the steering group? At what cadence is it re-declared?

    On the agenda · Discussion #18

One first contribution

Describe how a fair accelerator forum should decide, in general terms. Where it goes. Post it in The Commons.

23 minutes

Chip and accelerator experts

You know the chip, its interconnect and its power. Planning asks when to order it, in what shape, and who gets it when it runs short.

  1. 1. AI and accelerator fleets: Power binds, topology is a shape, and a busy chip isn’t a productive one. 5 min
  2. 2. Supply layers and lead times: Why chips, halls and power each have their own order-by date. 5 min
  3. 3. Approval and allocation: An approved ask still has to become chips of the right shape, place and time. 4 min
  4. 4. Buildings at AI density: What planning loses when halls stop being interchangeable. 9 min

Where it clicks. A fleet can hold enough chips and still be unable to place one training run, because topology is a shape. AI and accelerator fleets

Three open problems

  • Q3. When accelerators are short, who decides between internal teams and external customers? Operators publish splits and priority orders, but not the forum, the rule or the appeal. Know of a public account? Add it as a source.

    On the agenda · Discussion #4

  • Q13. When a team’s own software creates the demand, is a cap a better declaration than a forecast?

    On the agenda · Discussion #14 · good first

  • Who owns the mix forecast: the planner, the real-estate organization or the steering group? At what cadence is it re-declared?

    On the agenda · Discussion #18

One first contribution

Tell planners what they get wrong about accelerators, in general terms. Where it goes. Reply in the live thread.

15 minutes

Coming from resource or quota management?

You hand out quota, budgets or shared resources, and arbitrate who gets what. Capacity planning is the same problem, a year earlier.

  1. 1. Approval and allocation: Granting quota is approval. Delivering machines of the right shape is allocation. 4 min
  2. 2. Buffers and reserves: Who holds the headroom, and what it costs to hold it. 4 min
  3. 3. The coefficient: A unit of demand, priced. Each term has an owner. 3 min
  4. 4. Three prices: Who pays, should we build, and who gets scarce capacity now. 4 min

Where it clicks. Quota is a promise against supply that may not exist yet. Planning is deciding, before the commit date, which promises the fleet can keep. Approval and allocation

Three open problems

  • Q3. When accelerators are short, who decides between internal teams and external customers? Operators publish splits and priority orders, but not the forum, the rule or the appeal. Know of a public account? Add it as a source.

    On the agenda · Discussion #4

  • Q7. The method buys each supply layer to its own percentile. Can a simulation or a closed form do better, or show the rule is good enough?

    On the agenda · Discussion #8

  • TBM parks the unallocated line in staging buckets, and FinOps describes an “informed ignore”. Who should own shrinking it?

    On the agenda

One first contribution

How should a fair quota process decide between teams when supply is short? Describe the rule in general terms. Where it goes. Post it in The Commons.

18 minutes

Site reliability engineers

You know load, headroom and failure. The new parts are money, supply and the annual cycle.

Open this door · 4 readings, and why each one matters

Three open problems

  • Q6. Per-request coefficients break for caches, batches and stateful services, and batched inference is the big new case. What unit works, and where does the remainder go?

    On the agenda · Discussion #7

  • Q13. When a team’s own software creates the demand, is a cap a better declaration than a forecast?

    On the agenda · Discussion #14 · good first

  • In elastic cloud, shortage comes back as regional stockouts and reservation planning. What does a single-cloud team need beyond the guide’s one paragraph?

    On the agenda

One first contribution

Say how you would attribute cost for a cache or stateful service, in general terms. Where it goes. Post it in The Commons.

23 minutes

Finance partners

You fund the capacity, set the rates or run FinOps.

Open this door · 5 readings, and why each one matters

Three open problems

  • Q9. The paper’s ratios of 4 : 1 for machines and 19 : 1 for power are illustrative. What would you set for each layer, and who would sign it?

    On the agenda · Discussion #10

  • Q14. The strongest known challenge to the seed paper’s central claim: where a market price exists, does the agreement still hold? Argue it, either way.

    On the agenda · Discussion #15

  • TBM parks the unallocated line in staging buckets, and FinOps describes an “informed ignore”. Who should own shrinking it?

    On the agenda

One first contribution

Say what shortage-to-idle ratio you would set for one layer, and which role should sign it. Where it goes. Post it in The Commons.

28 minutes

Supply partners

You build or source the capacity: supply chain, data centres, power or network.

Open this door · 5 readings, and why each one matters

Three open problems

  • Q4. Find public sources for order-to-dock time, turn-up duration, cancel windows and reschedule terms. A filing, a talk or a vendor document, with a link and the quote.

    On the agenda · Discussion #5 · good first

  • Q5. How long does a large new load wait for power, from request to energized? Utility filings and interconnection queues may hold the answer.

    On the agenda · Discussion #6 · good first

  • Q11. The paper argues the supply review is the step most often missing before the executive decision. Is there public evidence either way? What should a supply review bring?

    On the agenda · Discussion #12 · good first

One first contribution

Add one public source on order-to-dock time, turn-up or cancel terms, with a link and the quote. Where it goes. Post it in The Commons.

After your door

Every open problem the body of knowledge names is on the agenda, by workstream. To talk them through with other planners, post in The Commons; working groups come later. For templates to use on Monday, see the tools. New to GitHub? See Join in.